Trending: Anna University 8th Sem Results April 2014 May/June 2014 Time Table/ Internal Marks Calculate CGPA Online SSLC Results 2014 12th Result 2014

Test Footer 1

Sunday, November 11, 2012

IM3316 PRODUCTION SYSTEM DESIGN PROJECT SYLLABUS | ANNA UNIVERSITY BE INDUSTRIAL ENGINEERING AND MANAGEMENT 6TH SEMESTER SYLLABUS REGULATION 2008 2011 2012-2013

Latest: TNEA 2014 Engineering Application Status, Counselling Date, Rank List
IM3316 PRODUCTION SYSTEM DESIGN PROJECT SYLLABUS | ANNA UNIVERSITY BE INDUSTRIAL ENGINEERING AND MANAGEMENT 6TH SEMESTER SYLLABUS REGULATION 2008 2011 2012-2013 BELOW IS THE ANNA UNIVERSITY SIXTH SEMESTER B.E INDUSTRIAL ENGINEERING AND MANAGEMENT DEPARTMENT SYLLABUS, TEXTBOOKS, REFERENCE BOOKS,EXAM PORTIONS,QUESTION BANK,PREVIOUS YEAR QUESTION PAPERS,MODEL QUESTION PAPERS, CLASS NOTES, IMPORTANT 2 MARKS, 8 MARKS, 16 MARKS TOPICS. IT IS APPLICABLE FOR ALL STUDENTS ADMITTED IN THE YEAR 2011 2012-2013 (ANNA UNIVERSITY CHENNAI,TRICHY,MADURAI, TIRUNELVELI,COIMBATORE), 2008 REGULATION OF ANNA UNIVERSITY CHENNAI AND STUDENTS ADMITTED IN ANNA UNIVERSITY CHENNAI DURING 2009

IM3316 PRODUCTION SYSTEM DESIGN PROJECT L T P C
0 0 6 3
OBJECTIVE:
 To apply the concepts of various techniques covered in the areas of
Industrial Engineering in a given practical situation. Projects shall be assigned
In the following areas:
1. Forecasting and Aggregate Planning
2. Materials Requirement Planning and Capacity Planning
3. Transportation and Distribution of goods
4. Group technology and Cellular manufacturing
5. Production and Project Scheduling
6. Quality Control
7. Plant Layout Design
8. Methods improvement in manufacturing and service organization
TOTAL: 90 PERIODS

No comments:

Post a Comment

Any doubt ??? Just throw it Here...