Trending: Anna University 8th Sem Results April 2014 May/June 2014 Time Table/ Internal Marks Calculate CGPA Online SSLC Results 2014 12th Result 2014

Test Footer 1

Tuesday, August 28, 2012

CE 2402 ESTIMATION AND QUANTITY SURVEYING SYLLABUS | ANNA UNIVERSITY BE CIVIL ENGINEERING 7TH SEMESTER SYLLABUS REGULATION 2008 2011 2012-2013

Latest: TNEA 2014 Engineering Application Status, Counselling Date, Rank List
CE 2402 ESTIMATION AND QUANTITY SURVEYING SYLLABUS | ANNA UNIVERSITY BE CIVIL ENGINEERING 7TH SEMESTER SYLLABUS REGULATION 2008 2011 2012-2013 BELOW IS THE ANNA UNIVERSITY SEVENTH SEMESTER BE CIVIL ENGINEERING DEPARTMENT SYLLABUS, TEXTBOOKS, REFERENCE BOOKS,EXAM PORTIONS IT IS APPLICABLE FOR ALL STUDENTS ADMITTED IN THE YEAR 2011 2012-2013 (ANNA UNIVERSITY CHENNAI,TRICHY,MADURAI,TIRUNELVELI,COIMBATORE), 2008 REGULATION OF ANNA UNIVERSITY CHENNAI AND STUDENTS ADMITTED IN ANNA UNIVERSITY CHENNAI DURING 2009


CE 2402 ESTIMATION AND QUANTITY SURVEYING L T P C
3 0 0 3
OBJECTIVE
This subject covers the various aspects of estimating of quantities of items of works involved in
buildings, water supply and sanitary works, road works and irrigation works. This also covers
the rate analysis, valuation of properties and preparation of reports for estimation of various
items. At the end of this course the student shall be able to estimate the material quantities,
prepare a bill of quantities, make specifications and prepare tender documents. Student should
also be able to prepare value estimates.
UNIT I ESTIMATE OF BUILDINGS 11
Load bearing and framed structures – Calculation of quantities of brick work, RCC, PCC,
Plastering, white washing, colour washing and painting / varnishing for shops, rooms, residential
building with flat and pitched roof – Various types of arches – Calculation of brick work and RCC
works in arches – Estimate of joineries for panelled and glazed doors, windows, ventilators,
handrails etc.
UNIT II ESTIMATE OF OTHER STRUCTURES 10
Estimating of septic tank, soak pit – sanitary and water supply installations – water supply pipe
line – sewer line – tube well – open well – estimate of bituminous and cement concrete roads –
estimate of retaining walls – culverts – estimating of irrigation works – aqueduct, syphon, fall.
UNIT III SPECIFICATION AND TENDERS 8
Data – Schedule of rates – Analysis of rates – Specifications – sources – Detailed and general
specifications – Tenders – Contracts – Types of contracts – Arbitration and legal requirements.
UNIT IV VALUATION 8
Necessity – Basics of value engineering – Capitalised value – Depreciation – Escalation – Value
of building – Calculation of Standard rent – Mortgage – Lease
UNIT V REPORT PREPARATION 8
Principles for report preparation – report on estimate of residential building – Culvert – Roads –
Water supply and sanitary installations – Tube wells – Open wells.
TOTAL: 45 PERIODS
TEXT BOOKS
1. Dutta, B.N., “Estimating and Costing in Civil Engineering”, UBS Publishers & Distributors
Pvt. Ltd., 2003
2. Kohli, D.D and Kohli, R.C., “A Text Book of Estimating and Costing (Civil)”, S.Chand &
Company Ltd., 2004
REFERENCES
1. PWD Data Book.

No comments:

Post a Comment

Any doubt ??? Just throw it Here...