Trending: Anna University 8th Sem Results April 2014 May/June 2014 Time Table/ Internal Marks Calculate CGPA Online SSLC Results 2014 12th Result 2014

Test Footer 1

Thursday, December 6, 2012

AE2036 PRODUCTION PLANNING AND CONTROL SYLLABUS | ANNA UNIVERSITY BE AERONAUTICAL ENGINEERING 8TH SEMESTER SYLLABUS REGULATION 2008 2011 2012-2013

Latest: TNEA 2014 Engineering Application Status, Counselling Date, Rank List
AE2036 PRODUCTION PLANNING AND CONTROL SYLLABUS | ANNA UNIVERSITY BE AERONAUTICAL ENGINEERING 8TH SEMESTER SYLLABUS REGULATION 2008 2011 2012-2013 BELOW IS THE ANNA UNIVERSITY 8TH SEMESTER B.E AERONAUTICAL ENGINEERING DEPARTMENT SYLLABUS, TEXTBOOKS, REFERENCE BOOKS,EXAM PORTIONS,QUESTION BANK,PREVIOUS YEAR QUESTION PAPERS,MODEL QUESTION PAPERS, CLASS NOTES, IMPORTANT 2 MARKS, 8 MARKS, 16 MARKS TOPICS. IT IS APPLICABLE FOR ALL STUDENTS ADMITTED IN THE YEAR 2011 2012-2013 (ANNA UNIVERSITY CHENNAI,TRICHY,MADURAI, TIRUNELVELI,COIMBATORE), 2008 REGULATION OF ANNA UNIVERSITY CHENNAI AND STUDENTS ADMITTED IN ANNA UNIVERSITY CHENNAI DURING 2009

AE2036 PRODUCTION PLANNING AND CONTROL L T P C
3 0 0 3
OBJECTIVE:
To understand the various components and functions of production planning and control
such as product planning, product scheduling and inventory control.
UNIT I INTRODUCTION 8
Factors affecting planning-Forecasting information necessary for pre-planning-sources of
information-Methods of forecasting-aircraft components requiring overhaul-repairmodifications-
premature-failures-project planning-estimates of plant, machinery, buildings,
manpower, materials, spare parts, time, and cost estimates.
UNIT II MATERIALS, MACHINES AND PROCESSES 9
Production engineering knowledge necessary for Planning, machine tools and processes.-
Materials including aircraft materials and their processing-Spare parts required for
overhaul and maintenance-Ground handling equipment-testing of components and aircraft
overhaul-standards for acceptance after overhaul.
UNIT III EQUIPMENT AND TOOLS 10
Pre-planning required for provision of special tools, jigs, fixtures and test equipment
required for overhaul and maintenance-types and description of major test equipment.
UNIT IV PRODUCTION PLANNING 10
Production planning function of routing, estimating and scheduling –LOB-CPM and PERT.
Queuing theory, sequencing in jobs, shop scheduling, assembly line balancing-charts and
graphs.
UNIT V PRODUCTION CONTROL 8
Production control functions of dispatching, progressing and evaluation-Activities of
progressing-shop procedures-maintenance of critical data statistics of evaluation control
charts.
TOTAL: 45 PERIODS
TEXT BOOKS:
1. Thomas. L. “Production planning and control” Mc Graw Hill, 1985.
2. Jain. K. C. and Aggarwal. L. N. “Production planning and control and Industrial
Management, Khanna publishers, 1990.
REFERENCES:
1. Buffa. E. S. and Sarin. R. K. “Modern production / operations management ”8th ed,
John Willey and sons, 2000.
2. MacNiece. E. H. “Production forecasting, planning and control”, John Willey, 1986.
3. Mages. J. F. “Production planning and Inventory control”, McGraw Hill, 1990.

No comments:

Post a Comment

Any doubt ??? Just throw it Here...