CN 9261 RESOURCE MANAGEMENT AND CONTROL IN CONSTRUCTION SYLLABUS | ANNA UNIVERSITY ME CONSTRUCTION ENGINEERING AND MANAGEMENT 1ST SEM SYLLABUS REGULATION 2009 2011 2012-2013

Latest: TNEA 2014 Engineering Application Status, Counselling Date, Rank List
CN 9261 RESOURCE MANAGEMENT AND CONTROL IN CONSTRUCTION SYLLABUS | ANNA UNIVERSITY ME CONSTRUCTION ENGINEERING AND MANAGEMENT 1ST SEM SYLLABUS REGULATION 2009 2011 2012-2013 BELOW IS THE ANNA UNIVERSITY FIRST SEMESTER ME CONSTRUCTION ENGINEERING AND MANAGEMENT DEPARTMENT SYLLABUS, TEXTBOOKS, REFERENCE BOOKS,EXAM PORTIONS,QUESTION BANK,PREVIOUS YEAR QUESTION PAPERS,MODEL QUESTION PAPERS, CLASS NOTES, IMPORTANT 2 MARKS, 8 MARKS, 16 MARKS TOPICS. IT IS APPLICABLE FOR ALL STUDENTS ADMITTED IN THE YEAR 2011 2012-2013 (ANNA UNIVERSITY CHENNAI,TRICHY,MADURAI,TIRUNELVELI,COIMBATORE), 2009 REGULATION OF ANNA UNIVERSITY CHENNAI AND STUDENTS ADMITTED IN ANNA UNIVERSITY CHENNAI DURING 2009


CN 9261 RESOURCE MANAGEMENT AND CONTROL IN CONSTRUCTION L T P C  3 0 0 3
OBJECTIVE:
 To study the management of various resources involved in construction
UNIT I RESOURCE PLANNING 10
Resource Planning, Procurement, Identification, Personnel, Planning for material,
Labour, time schedule and cost control, Types of resources, manpower, Equipment,
Material, Money, Time.
15
UNIT II LABOUR MANAGEMENT 5
Systems approach, Characteristics of resources, Utilization, measurement of actual
resources required, Tools for measurement of resources, Labour, Classes of Labour,
Cost of Labour, Labour schedule, optimum use Labour.
UNIT III MATERIALS AND EQUIPMENT 10
Material: Time of purchase, quantity of material, sources, Transportation, Delivery and
Distribution.
Equipment: Planning and selecting by optimistic choice with respect to cost, Time,
Source and handling.
UNIT IV TIME MANAGEMENT 10
Personnel time, Management and planning, managing time on the project, forecasting
the future, Critical path measuring the changes and their effects - Cash flow and cost
control
UNIT V RESOURCE ALLOCATION AND LEVELLING 10
Time-cost trade off, Computer application - resource leveling, resource list, resource
allocation, Resource loading, Cumulative cost - Value Management.
TOTAL: 45 PERIODS
REFERENCES:
1. Andrew,D., Szilagg, Hand Book of Engineering Management, 1982.
2. James.A., Adrain, Quantitative Methods in Construction Management, American
Elsevier Publishing Co., Inc., 1973.
3. Harvey, A., Levine, Project Management using Micro Computers, Obsorne- McGraw
Hill C.A.Publishing Co., Inc. 1988.
4. Oxley Rand Poslcit, Management Techniques applied to the Construction Industry,
Granda Publishing Ltd., 1980.