Trending: Anna University 8th Sem Results April 2014 May/June 2014 Time Table/ Internal Marks Calculate CGPA Online SSLC Results 2014 12th Result 2014

Test Footer 1

Saturday, August 4, 2012

GI3301 SURVEYING 3 III SYLLABUS | ANNA UNIVERSITY BE GEOINFORMATICS ENGINEERING 5TH SEMESTER SYLLABUS REGULATION 2008 2011-2012

Latest: TNEA 2014 Engineering Application Status, Counselling Date, Rank List
GI3301 SURVEYING 3 III SYLLABUS | ANNA UNIVERSITY BE GEOINFORMATICS ENGINEERING 5TH SEMESTER SYLLABUS REGULATION 2008 2011-2012 BELOW IS THE ANNA UNIVERSITY FIFTH SEMESTER BE GEOINFORMATICS ENGINEERING DEPARTMENT SYLLABUS IT IS APPLICABLE FOR ALL STUDENTS ADMITTED IN THE YEAR 2011-2012 (ANNA UNIVERSITY CHENNAI,TRICHY,MADURAI,TIRUNELVELI,COIMBATORE), 2008 REGULATION OF ANNA UNIVERSITY CHENNAI AND STUDENTS ADMITTED IN ANNA UNIVERSITY CHENNAI DURING 2009


GI3301 SURVEYING III L T P C
3 0 0 3
OBJECTIVE:
The Subject of Surveying, astronomy, and setting out works have also acquired a special
significance in the context of an unprecedented explosion of knowledge; thereby
making radical changes in the concept of previously acknowledged thinking. The last
Chapter deals with modern systems in Surveying and Mapping. It presents an overview of
the latest techniques in the field of instrumentation and methodologies being employed in
Geomatics.
UNIT I ASTRONOMICAL SURVEYING 16
Celestial sphere – Astronomical terms and definitions – Motion of sun and stars –
Apparent altitude and corrections – Celestial coordinate systems – Different time
systems – Nautical Almanac – Star constellations – Practical astronomy – Field
observations and calculations for azimuth, time, longitude and latitude.
UNIT II ROUTE SURVEYING 4
Reconnaissance – Route surveys for highways, railways and waterways.
UNIT III CURVE RANGING 10
Horizontal and vertical curves – Simple curves – Compound and reverse curves – Setting
out Methods – Transition curves – Functions and requirements – Setting out by offsets and
angles – Vertical curves – Sight distances.
UNIT IV MINE SURVEYING 5
Equipment – Correlation – Weisbach triangle – Underground levelling – Tunnel
alignment and setting out – Transfer of azimuth – Gyro Theodolite - Shafts Adits.
UNIT V MODERN SYSTEMS IN SURVEYING AND MAPPING 10
General – Electronic distance Measurement (EDM) – Digital Theodolite and its
accuracy – Total Station and it’s inbuilt programs like Co-go, Missing Line
Measurement, Remote Elevation Measurement, 3D Coordinate Measurement,
Automatic Azimuth Angle Setting, Resection, Setting out measurements and Area
Calculation. Automatic total station – Laser Theodolite. Laser alignment instrument and
electronic level – Digital level – Instrument for measuring tunnel profiles – Inertial positioning
systems – Global Positioning System (GPS) – Digital Terrain Model (DTM) – LIDAR
Measurements - Introduction to mapping software – Modern Trends.
TOTAL : 45 PERIDOS
39
TEXTBOOKS:
1. Kanetkar T.P. Surveying and Levelling, Vols I and II, United Book Corporation, Pune,
1994
2. Punmia V.C. Surveying, Vols I, II and III Laxmi Publications, 1989.
REFERENCES:
1. James M. Anderson and Edward M. Mikhail, Surveying, Theory and Practice,
Seventh Edition, Mc Graw Hill 2001.
2. Bannister and S. Raymond, Surveying, Seventh Edition, Longman 2004.
3. S.K. Roy, Fundamentals of Surveying, Second Edition, Prentice’ Hall of India
2004.
4. A.M. Chandra, Plane Surveying, New Age International Publishers 2002.
5. Alak De, Plane Surveying, S. Chand & Company Ltd., 2000.

No comments:

Post a Comment

Any doubt ??? Just throw it Here...